SAP 029-606-009 - CSAH 6 FDR, Pave & Turn Lane CSAH 6 full depth reclamation, mill & overlay, bituminous pavement, aggregate shouldering and turn lane construction. From Th 87 to TH 34 in Park Rapids. Length: 5.283 miles